Follow Joulz online

Joulz op Facebook Joulz op LinkedIn Joulz op Twitter Joulz op YouTube

New high-voltage transformer for Stedin installed at Merwedehaven in Dordrecht

A new high-voltage transformer for grid operator Stedin arrived in the Merwedehaven harbour in Dordrecht on 27 September 2017. The high-voltage specialists of Joulz Energy Solutions will install the new transformer to allow it to go into service towards the end of this year. This third transformer will make the regional Merwedehaven energy hub ready for the future.

DSC 0571

DSC 0588

Read more about this project on the Stedin website

Published: 29 September 2017

energysolutions

Copyright © 2015-2019 Joulz Energy Solutions